PRV6 / NL6 — Herafiyeh (light-industrial)
NRW zone study refresh · Window: Oct 2025 – Jun 2026 (9 mo, Jun preliminary) · Supply: SCADA PRV06-02 · AWC NRW & Energy Efficiency Dept.
← All DMAs NL1 → PRV6 combined → CNS 20-07-2026
Monthly supply vs billed — Oct 2025 – Jun 2026
⚠ Jun-26 preliminary · supply boundary caveat
NL6 supply = PRV06-02 (SCADA). ⚠ Carried-forward caveat: PRV06-02 may feed beyond the NL6 boundary — unresolved from the prior study, so NRW% may overstate losses. Jun-26 bill count ~5–6% below trailing average.
Problem worklist — 207 accounts (9-mo window)
NL6: 207 of 347 active (59.7%)
Big-consumer note: top-18 meters = 63% of zone billed volume — a genuine big-meter zone. ⚠ The #1 consumer (contract 29918, 846.7 m³/mo) has no GPS in CNS.
Zone map — DMA & customer locations
Use the layer control (top-right) to show NL6 only · marker size = avg m³/mo · gold ring = big consumer
Data quality, roster & verification — NL6
Data as of CNS export 20-07-2026 · SCADA PRV06-01/02 read 21-07-2026 · Prepared by NRW Section · Aqaba Water Company · Made by Ehab Basuoni